Laserfiche WebLink
• i <br /> DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> t ANALYSIS P fks:: <br /> F, <br /> hit <br /> N <br /> Palicrl ' aca PH Dasa] <br /> .......................... ...... ... �.i <br /> .... <br /> Lnc , CA LE=SAAot. ...... <br /> NER(S . 2dk' <br /> Ar-,:, <br /> :U...t....r..:. <br /> .... <br /> CLIENT: Hollingsworth Really DATE: 06/17/1993 <br /> PROJECT MANAGER: Wayne Hollingsworth SAMPLE LOCATION: MW-3 <br /> SAMPLER: DON LIGHT START TIME: 12:56 <br /> GROUNDWATER. XXX 11VADOSE: OTHER: <br /> CASING ELEVATION: (FEET MSL) 9.42 FEET CASING DIAMETER: 2 INCH <br /> DEPTH TO WATER: 9.45 FEET CALCULATED PURGE VOLUME: 2.30 GAL. <br /> DEPTH OFWELL: 23.58 FEET 1ACTUAL VOLUME PER PURGE: 2.5 GAL. <br /> TIME ...OT R­ <br /> 6OLd <br /> M:F H <br /> WE <br /> "M M <br /> tbn q <br /> 13:00 0 7.0 1515 22.0 LT. TURBID NO ODOR <br /> 2.5 7.0 1503 20.4 CLEAR <br /> 5.0 7.0 1500 20.4 CLEAR <br /> 7.5 7.0 1495 20.5 CLEAR 41 <br /> PURGE METHOD : ISCO PERISTALTIC PUMP <br /> SAMPLE METHOD: STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY- CAP AND SEAL ARE SECURE, LOCK IS INSTALLED. <br /> REMARKS: <br /> WEATHER; CLEAR SKIES, STRONG WINDS OUT OF THE NORTH/EAST. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH ALCONOX. <br /> GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: ON THE NORTH/WEST SIDE OF THE PUMP ISLANDS. <br /> CONTAINMENT: D.O.T. 17 DRUM. <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0 & 7.0) <br /> ORION CONDUCTIVITY METER <br /> 0 ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />