Laserfiche WebLink
CONCLUSIONS <br /> .' All soil identified as being impacted by petroleum hydrocarbons has been removed from the site. <br /> Temporary groundwater impact within the tank pit as a result of overexcavation was subsequently <br /> eliminated by volatilization and degradation. <br /> RECOMMENDATIONS <br /> Based on the results of this investigation Ground Zero recommends the following: <br /> o Install a replacement well for monitoring well MW-3, which was destroyed in preparation for <br /> soil overexcavation. The work plan and permits to perform this work have already been <br /> submitted and approved. <br /> o Survey and develop the replacement well. <br /> o Purge and sample all wells at the site. <br /> Please call us if you have any questions regarding this matter. <br /> Respectfully, <br /> Groun ero Analysis, Inc. <br /> i <br /> l <br /> c, O G�o(� <br /> Justin M. Power <br /> Project Manager <br /> s <br /> GREGORY P. <br /> � Nao.. 5023 � <br /> Gregory P. Stahl �lgTf OF CAIIF���`�- <br /> CA Registered Geologist 5023 <br /> cc: Mr. Kerry Zimmerman - Law Offices of Riddle & Isola <br /> Mr. Richard Bokides - Property Owner <br />• 4 <br />