Laserfiche WebLink
DRAFT / Mr. Chuck Trujillo <br /> December 8,2003 <br /> Planned Response: Areas containing ponded crude oil will be excavated and direct loaded onto <br /> trucks. Saturated soils that appear to pose a risk of further liquid crude oil migration will be <br /> excavated and stockpiled on site. Stockpiles will be ontop of and covered with plastic sheeting <br /> following Cambria's standard field procedures (Attachment Q. Efforts will be made to excavate <br /> only crude-oil saturated soils which appear to contain free-flowing crude oil. Excavation will be <br /> directed by a trained field geologist using a portable photoionization detector. <br /> CLOSING <br /> This is an interim workplan and will be modified or amended as necessary. Cambria appreciates <br /> the opportunity to provide environmental services to Chevron Pipeline Company. Please call Bob <br /> Schultz at (510)420-3341 with any questions or comments. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Robert W. Schultz,R.G. <br /> Senior Project Geologist <br /> Attachments: A- Field Geologist Health and Safety Plan <br /> B - Standard Field Procedures for Excavation Sampling <br /> C - Standard Field Procedures of Soil Stockpiles <br /> cc: Mr. Bob Gondek,CTPC <br /> 1:\0-Chevron Pipe line\Tracy KLM MP151.5\draft-workplan.doc <br /> 3 <br />