My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0020059
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2500 – Emergency Response Program
>
CO0020059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 10:35:10 AM
Creation date
2/22/2019 8:47:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
CO0020059
PE
2546
STREET_NUMBER
23577
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
95391
ENTERED_DATE
12/5/2003 12:00:00 AM
SITE_LOCATION
23577 MOUNTAIN HOUSE PARKWAY
RECEIVED_DATE
12/4/2003 12:00:00 AM
QC Status
Approved
Scanner
ADMIN
Supplemental fields
FilePath
\MIGRATIONS4\M\MOUNTAIN HOUSE\23577\CO0020059.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM BRIA <br /> SOIL STOCKPILE COVERING PROCEDURES <br /> Soil excavation is often completed to remove contaminant-bearing soils. The removed soils are typically <br /> stockpiled onsite and sampled. Cambria has developed standard sampling procedures to cover soil <br /> stockpiled soils. The procedures ensure that the stockpiles are built and covered in compliance with <br /> Federal, State and local regulatory agency guidelines. <br /> Stockpiled soil shall be placed on plastic sheeting and covered with plastic sheeting at the termination of <br /> the task generating such soil. Regardless of task progress, any stockpile not being actively manipulated <br /> shall be covered with plastic sheeting within one-hour of initiating stockpile generation. <br /> Plastic sheeting underlying any stockpile shall include a perimeter berm to prevent escape of liquids or <br /> wet soil from the stockpile. Plastic sheeting overlying any stockpile shall be secured with sand bags or <br /> equivalent. <br /> My Compute/Misc.on Server(F)rremplates/SOPs <br />
The URL can be used to link to this page
Your browser does not support the video tag.