My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARDINAL
>
221
>
2900 - Site Mitigation Program
>
PR0544156
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 12:14:53 PM
Creation date
2/22/2019 11:25:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544156
PE
2953
FACILITY_ID
FA0005675
FACILITY_NAME
CARDOZA TRUCKING
STREET_NUMBER
221
Direction
N
STREET_NAME
CARDINAL
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14330013
CURRENT_STATUS
02
SITE_LOCATION
221 N CARDINAL AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Earth Systems* Consultants <br /> Northern California 5880 West Las Posit" <br /> Blvd•, Sul 9 U. <br /> Pleasanton, GA 94588 <br /> (510)463.0844 <br /> FAX(510)463.0646 <br /> Fite No. NST-9039-01 <br /> October 6, 1992 <br /> Faison Energy <br /> fJ <br /> P.O. Box 1257 OCT 0 6 1992 <br /> Stockton, California 85201 <br /> Attention: Mr. Urry Gooden ElV1/iRONMENTAL HEALTM <br /> y <br /> PERMITISERVICE• <br /> Subject; $tit Contamination Remediation Site <br /> 231 Cardinal Avenue <br /> Stockton, California <br /> COMPACTION TEST REPORT <br /> Gentlemen: <br /> In awordance with your request and authorization, we have performed limited compaction <br /> testing at the subject project. From September 29 through October 2. 1992, a representative <br /> of our firm performed relativo compaction testing at the above referenced project on the <br /> backfill of art approximately 20-foot by 00-foot excavation which had been Created by the <br /> removal of hydrocarbon contaminated soil. At the time of our arrival the pit was about 12 feet <br /> deep. For safety purpose$, compaction testing was not commenced until the fill had been ralsw <br /> to the 7-foot depth. N Is our understandinta that the overall excavation depth may be on the <br /> order of 25 to 30 feat. We were not present during the placement and compaction of the initial <br /> backfill below, t2 fast and can not comment on its condition. During the backflii process, a pit 9 <br /> feet deep wag created for the excavator adjacent to the main pit. Tests were conducted at random <br /> loeations in g=rdanCo with ASTM 02922-81 and ASTM D3017.68, Nuclear Density Test <br /> Procedures. The backfill Consisted of native soft to within 2 feet of grade and import sand <br /> above. <br /> The maximum density and optimum moisture were determined In the laboratory in accordance <br /> with ASTIi I Tast Method D1667-91. Lab results are shown in Table 1. The relative k=tlons of <br /> the oompaction tests are presented and their results are summarized on the attached Table It. A <br /> total of sixteen relative compaction tests were performed. Test results indicate that a minimum <br /> of go percent relative compaction has been obtained within the areas tasted In the upper 7 feet. <br /> This firm did not perform a Bolls investigation, did not conduct any tests to determine the <br /> general condition, adequacy, remediation or stability of soils on the property, nor did it observe <br /> the backfilling or compacting operations which were completed at the time our personnel were <br /> called to the site. The only services performed were the specific moisture end density tests <br /> summarized in this report. These test results provide only limited Information about the near <br /> surface materials observed at the locations and depths tested and cannot be rellad upon for <br /> information about deeper subsurface oondltlons or Compaction, or to determine the <br /> $ppmpriateness of any design or construction of improvements on the site, No Inspection was <br /> made of the contractor's work and no guarantee or warranty of that work in backfilling or <br /> compaction of the Solis on the site is made or iMplied. <br />
The URL can be used to link to this page
Your browser does not support the video tag.