My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARNEGIE
>
555
>
2900 - Site Mitigation Program
>
PR0505723
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 12:20:54 PM
Creation date
2/22/2019 11:42:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505723
PE
2950
FACILITY_ID
FA0006962
STREET_NUMBER
555
STREET_NAME
CARNEGIE
STREET_TYPE
ST
City
MANTECA
Zip
95337-6102
APN
22119064
CURRENT_STATUS
01
SITE_LOCATION
555 CARNEGIE ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SMTH <br /> SITE SAFETY PLAN <br /> ' On-site communications: ❑ Radio <br /> Verbal ❑ Hand Signals <br /> ❑ Other <br /> ' Designate hand signals here: <br /> ' Off-site communications: <br /> ❑ Radio ® Telephone <br /> ❑ Other <br /> ' The specific signal for an emergency is: Verbally Given <br /> ' The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTEIS/ ON SITE MAP ❑ CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal-protective equipment i.e. <br /> ' gloves coveralls) will be Placed on and covered with 6 <br /> mil plastic sheeting along with the drill cuttings <br /> Location of Wash Water: Site Office <br /> Location of Toilet: Site Office <br /> ' Location of Drinking Water: SMTH truck/Site Office <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP ❑CHECK WHEN DONE <br /> 1 Equipment Decontamination Procedure: <br /> Equipment will be washed with a trisodium <br /> ' phosphate solution and/or steamcleaned. <br /> ' Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> determined. <br /> 1 <br /> PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.