My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
33
>
2900 - Site Mitigation Program
>
PR0539914
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:25:49 PM
Creation date
2/22/2019 1:33:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0539914
PE
2950
FACILITY_ID
FA0022828
FACILITY_NAME
HOWARD JOHNSON STOCKTON HOTEL
STREET_NUMBER
33
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13728007
CURRENT_STATUS
01
SITE_LOCATION
33 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alpha <br /> Environmental <br /> EPA Method 8082/8080A. <br /> Quality Assurance/Quality Control(QA/QC) <br /> In accordance with the best practices for sample collection and analysis,the analytical laboratory will <br /> analyze a duplicate sample(for soil and soil vapor sampling),laboratory control samples,and utilize <br /> other QA/QC protocols established for State-certified analytical laboratories. <br /> 3.1.5 Task 5-Reporting <br /> Following the completion of our field investigation and receipt of the final laboratory results, a <br /> written report summarizing the data collected during this field investigation and interpretation of the <br /> subsequent analytical results will be prepared, including our recommendations. The report will <br /> include figures and laboratory reports with related chain-of-custody documentation. The analytical <br /> results and final report will be submitted to East West Bank. <br /> 3.2 Project Schedule <br /> Alpha Environmental is prepared to begin this work upon receipt of the SJCEHD approval of this Work Plan. <br /> Once approval is received, Alpha Environmental will provide the SJCEHD with the required five-day <br /> notification prior to mobilization,so that the agency can provide field oversight,as needed.We will verbally <br /> report the results of this testing as the laboratory data becomes available. The written report will be submitted <br /> approximately two to three weeks after receiving the final laboratory report. Further,it should be noted that <br /> the scope of work and project schedule are based on appropriate site access during the investigation. <br /> 33 North Center Street 5 March 2014 <br /> Stockton,California <br />
The URL can be used to link to this page
Your browser does not support the video tag.