Laserfiche WebLink
AUGUST 1994 <br /> QUARTERLY STATUS REPORT (CONTINUED) <br /> - Times and dates equipment was not operating, cause of shutdown, and a <br /> corrective action plan to insure similar shutdowns do no reoccur: <br /> Not Applicable. <br /> • Timelines for activities currently underway or proposed: <br /> Greyhound proposes to continue the groundwater monitoring and sampling <br /> program in accordance with all applicable LUFT and Tri-Regional requirements <br /> through the end of 1994. The Supplemental Site Assessment report will be <br /> submitted to PHS shortly <br /> The next groundwater sampling_event will be in November 1994 with report <br /> submittal no later than December 15, 1994 <br /> • Estimates of the quantity of contamination remaining in soil and <br /> groundwater, and time for completing remediation: <br /> The quantities of remaining soil and groundwater contamination will be <br /> estimated based on the results of the second Supplemental Site Assessment. <br /> PARESSYR011VOL1 WP1725218108969108969L04 DOC <br /> S <br />