My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000618
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
3500 - Local Oversight Program
>
PR0544166
>
ARCHIVED REPORTS XR0000618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:33:43 PM
Creation date
2/22/2019 1:55:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000618
RECORD_ID
PR0544166
PE
3528
FACILITY_ID
FA0005252
FACILITY_NAME
GREYHOUND LINES INC
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730011
CURRENT_STATUS
02
SITE_LOCATION
121 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=ES ENGINEERING-SCIENCE <br /> r <br /> SECTION 1 <br /> INTRODUCTION <br /> r <br />' L 1.1 PURPOSE AND REQUIREMENTS <br /> The purpose of this safety plan is to establish personnel protection standards and <br /> mandatory safety practices and procedures. This plan assigns responsibilities, <br /> establishes standard operating procedures, and provides for contingencies that may arse <br /> while operations are being conducted at Underground Storage Tanks (UST) sites. <br /> rThe provisions of the plan are mandatory for all on-site personnel. All ES <br /> personnel shall abide by this plan. Any supplemental plans used by subcontractors <br /> shall conform to this plan as a muumum. All personnel who engage in project , <br /> activities must be familiar with this plan and comply with its requirements. <br /> 1.2 SI'Z'E DESCRIPTION <br /> 1.2.1 Site Description <br /> The Greyhound Stockton Terminal is located at 121 S Center Street m Stockton, <br /> California. The facility formerly had underground storage tanks containing diesel fuel <br /> and fuel service lines to bus ports that have since been removed <br /> 1.3 SCOPE OF WORK <br /> Field tasks to be performed at the Greyhound Terminal in Stockton, California <br /> include the installation of 8 soil borings around the former UST system and diesel fuel <br /> supply lines. r L <br /> 1.4 PROJECT TEAM ORGANIZATION <br /> Table 1.1 describes the responsibilities of all on-site personnel associated with flus <br /> project. The names of principal on-site personnel associated with this project are <br /> f delineated below: <br /> Project Manager: David Nickerson (FS Syracuse) <br /> Field Team Leader: (ES Alameda) <br /> Site Health and Safety Officer: (ES Alameda) <br /> All ES personnel have been appropriately trained in first aid, hazardous waste <br /> safety procedures including the operating and fitting of personal protective equipment, <br /> and are experienced with the types of field operations to be employed at the Greyhound <br /> Stockton Terminal. <br /> r <br /> PARESSIMIWOL1 WP1725386 08969125386204 DOC <br />'r <br />
The URL can be used to link to this page
Your browser does not support the video tag.