Laserfiche WebLink
Mr Michael J Infurna <br /> April 13, 1993 <br /> Page 2 <br /> The April monthly monitoring visit was conducted on April 8, 1993 Results will <br /> w _ _ be submitted shortly The_next sampling event will be conducted during June 19931 _ <br /> You will be notified at least one week prior to the sampling event so that a <br /> representative can be on-site during sampling A quarterly status report will be <br /> prepared and submitted to your department on or before July 17, 1993 <br /> If you have questions or require any additional information, please call us at: (315) <br /> 451-9560 <br /> Sincerely, <br /> ENGINEERING-SCIENCE, INC. <br /> 0"-� 6 6�4' <br /> David A Nickerson <br /> Project Manager <br /> Q "I'll <br /> David L Chaffin, R G. <br /> California Registered Geologist <br /> (No 4885) <br /> DLC/DAN/lml - - <br /> cc T Portele, GLI, Dallas, TX <br /> Elizabeth Thayer, Regional Water Quality Control Board <br /> Laurie A Cotulla, EHD, Program Manager <br /> LML/SY360 22/0621 REV 3 <br />