SEPTEMBER 1992 <br /> QUARTERLY STATUS REPORT (CONTINUED) <br /> MW-3 and B-1 only The extent of soil contamination at the site will be <br /> determined during the proposed supplemental subsurface investigation. <br /> • Tank owner commitment letter; <br /> The cover letter submitted with this report is intended to serve as the tank owner <br /> commitment letter GLI has approved the report and designated ES as their <br /> responsible party <br /> • The quantity of groundwater and vapors removed during the reporting <br /> period and cumulative to date; <br /> Not Applicable. <br /> • Times and dates equipment was not operating, cause of shutdown, and a <br /> corrective action plan to insure similar shutdowns do no reoccur; <br /> Not Applicable <br /> • Timelines for activities currently underway or proposed; <br /> Greyhound will continue the groundwater monitoring program in accordance <br /> with all applicable LUFT and Tri-Regional requirements An evaluation of the <br /> data obtained from these programs after one year will be made to determine <br /> whether further action is required at the site <br /> Our next sampling event will be conducted during the month of December <br /> 1992. Mr Michael Infurna (EHD) will be notified at least one week prior to <br /> the sampling event so that a representative can be on site during the sampling <br /> A quarterly status report will be prepared and submitted to the EHD on or <br /> before January 17, 1992 <br /> In addition, GLI will submit a work plan to perform additional assessment <br /> activities to the EHD no later than November 6, 1992 GLI will implement the <br /> supplemental site investigation after the work plan has been approved by EHD <br /> A Soil Remediation Plan will be submitted to EHD within eight (8) weeks of <br /> the start of field activities to allow for analytical testing, report preparation, and <br /> review <br /> LMIJSY139 311294 REV 3 <br /> 4 <br />