Laserfiche WebLink
SEPTEMBER 1996 <br /> QUARTERLY STATUS REPORT (CONTINUED) <br /> Table 4resents a summary ummary of the analytical results from all previous soil sampling events <br /> • Site map delineating contamination contours for groundwater and soil based on <br /> recent data <br /> Figure 3 is a site plan that presents the analytical results from the groundwater samples <br /> collected on September 4, 1996 A "zero" line for groundwater contamination was not <br /> included in the figure because BTEX parameters and TPH D were not detected in any of <br /> the samples and TPH-D has only been detected intermittently <br /> Figure 4 is a site plan that presents a summary of the analytical results from all the soil <br /> samples collected from the site A TPH-D "zero" line and 10-ppm line are indicated in the <br /> figure <br /> • Estimates of the quantity of contamination remaining in soil and groundwater, and <br /> time for completing remediation <br /> Based on the results of the second supplemental site assessment, approximately 6,000 <br /> cubic yards of soil containing detectable concentrations of TPH-D are estimated to remain <br /> beneath the site <br /> • Method of cleanup proposed or implemented to date <br /> 1 <br /> Based on the results of the -4 installation and September groundwater sampling, <br /> PHS-EHD has verbally requested t a site closure report be prepared and submitted to <br /> PHS-EHD for final const eratio of site closure with no further action required <br /> je<x beA 1 <br /> • Times and dates equipment was not operating, cause of shutdown, and a corrective <br /> action plan to ensure similar shutdowns do not reoccur <br /> Not Applicable <br /> • Time schedules for completion of the site investigation and remediation <br /> Greyhound is currently preparing the final closure report <br /> • Method of disposal and disposal location of released hazardous substances and any <br /> contaminated soil, groundwater, or surface water <br /> During the September 1996 site visit, groundwater generated from purging the onsite <br /> monitoring wells during previous sampling events was discharged to the sanitary sewer <br /> following receipt of approval from Mr Morris L Allen of the City of Stockton <br /> Department of Municipal Utilities <br /> i <br /> PARESSYROI%VOLl WP1728878108969148969LO2 WW6 <br /> 3 <br />