My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000634
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
3500 - Local Oversight Program
>
PR0544166
>
ARCHIVED REPORTS XR0000634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:00:07 PM
Creation date
2/22/2019 2:10:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000634
RECORD_ID
PR0544166
PE
3528
FACILITY_ID
FA0005252
FACILITY_NAME
GREYHOUND LINES INC
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730011
CURRENT_STATUS
02
SITE_LOCATION
121 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUNE 1996 <br /> QUARTERLY STATUS REPORT (CONTINUED) <br /> Figure 3 is a site plan that presents the analytical results from the groundwater samples <br /> collected on June 4, 1996 A "zero" line for groundwater contamination was not included <br /> in the figure because BTEX parameters and TPH-D were not detected in any of the <br /> samples and TPH-D has only been detected intermittently <br /> Figure 4 is a site plan that presents a summary of the analytical results from all the soil <br /> samples collected from the site A TPH-D "zero" line and 10-ppm line are indicated in the <br /> figure <br /> Estimates of the quantity of contamination remaining in soil and groundwater, and <br /> time for completing remediation <br /> Based on the results of the second supplemental site assessment, approximately 61000 `r <br /> cubic yards of soil containing detectable concentrations of TPH-D are estimated to remain <br /> beneath the site <br /> Method of cleanup proposed or implemented to date <br /> Greyhound will implement the recently approved "Offsite Assessment and Feasibility <br /> Study" work plan, dated September 1995 A feasibility study report in which a minimum <br /> of two viable soil cleanup alternatives are evaluated will be submitted <br /> • Times and dates equipment was not operating, cause of shutdown, and a corrective <br /> action plan to ensure similar shutdowns do not reoccur <br /> Not Applicable <br /> Time schedules for completion of the site investigation and remediation <br /> Greyhound is currently securing the permits required to install an off-site monitoring well <br /> during the offsite assessment <br /> • Method of disposal and disposal location of released hazardous substances and any <br /> contaminated soil, groundwater, or surface water <br /> During the June 1996 site visit, groundwater generated while purging the onsite <br /> monitoring wells during previous sampling events was discharged to the sanitary sewer <br /> following receipt of approval from Mr Morris L Allen of the City of Stockton <br /> Department of Municipal Utilities <br /> PARESSYROINOL1 WP17288781089691089691-01 WW6 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.