Laserfiche WebLink
SEPTEMBER 1995 <br /> QUARTERLY STATUS REPORT (CONTINUED) <br /> 1 <br /> • Time schedules for completion of the site investigation and remediation <br /> Greyhound has prepared and submitted a work plan and is currently securing the <br /> permits required to install an off-site monitoring well in order to fully define the extent <br /> of soil and groundwater contamination <br /> • Method of disposal and disposal location of released hazardous substances and any <br /> contaminated soil, groundwater, or surface water <br /> During the September 1995 site visit, three drums of groundwater were generated while <br /> purging the onsite monitoring wells. Nine drums from prior sampling events remain <br /> onsite. Greyhound is currently arranging authorization for on-site disposal of the water <br /> to the Stockton public sewer system by providing analytical results to the Stockton <br /> Public Works Department j <br /> • Manifest for transport of hazardous substances <br /> Not Applicable. <br /> • Tank owner commitment letter <br /> The cover letter submitted with this report is intended to serve as the tank owner <br /> commitment letter. Greyhound has approved the report and designated Parsons ES as <br /> their responsible party <br /> PARFSSYROIIVOLI WP1727211108969108969LO6 DOC <br /> 4 <br />