Laserfiche WebLink
X71 ] <br /> r� • <br /> JUNE 1994 <br /> SEMI-ANNUAL STATUS REPORT (CONTINUED) <br /> • Times and dates equipment was not operating, cause of shutdown, and a <br /> E corrective action plan to insure similar shutdowns do no reoccur: <br /> Not Applicable. <br /> • Timelines for activities currently underway or proposed: <br /> ] a r <br /> 4 <br /> Greyhound proposes to continue the groundwater monitoring and sampling <br /> program in accordance with all applicable LUFT and Tn-Regional requirements <br /> through the end of 1994 . The Supplemental Site Assessment Will likely be <br /> scheduled in August 1994 after all applicable permits have been secured <br /> The next groundwater sampling event will be in December x1994 with report <br /> submittal no later than January 15, 1995 <br /> • Estimates of the quantity of contamination remaining in soil and <br /> groundwater, and time for completing remediation: <br /> The quantities of remaining soil and groundwater contamination have not been <br /> estimated because results from previous investigations and monitonnglsampling <br /> events indicate that the quantities are inconsequential. No remediation has been <br /> proposed. However, if the results of the second Supplemental Site Assessment <br /> indicate that remediation is necessary, remedial alternatives will be evaluated <br /> 1 <br /> PARB.ssYR011VOLi WP1725218108969108969102 DOC <br /> 5 <br />