Laserfiche WebLink
: Ott <br /> DECEMBER 1993 <br /> BIANNUAL STATUS REPORT (CONTINUED) <br /> • Site map delineating contamination contours for soil and groundwater <br /> based on recent data: <br /> Figure 4 is a site map showing analytical results for soil samples collected <br /> during the preliminary site investigation (September 1991) The area of <br /> _ contamination appears to be limited, with constituents detected at MW-2, MW-3 <br /> and B-1 only The extent of soil contamination at the site was further defined_ _z <br /> during the supplemental subsurface investigation. A report summarizing the <br /> findings of this investigation was submitted to EHD on April 1,1993. <br /> A map delineating the extent of groundwater contamination has not been <br /> prepared since none of the analyzed parameters were detected in the <br /> groundwater samples collected during the December 1993 sampling event. <br /> Figure 3 shows recent analytical data for groundwater samples plotted on a site <br /> base map <br /> r <br /> • Tank owner commitment letter: <br /> The cover letter submitted with this report is intended to serve as the tank owner <br /> commitment letter. GLI has approved the report and designated ES as their <br /> ® responsible party. <br /> • The quantity of groundwater and vapors removed during the reporting <br /> period and cumulative to date: <br /> Not Applicable. <br /> • Times and dates equipment was not operating, cause of shutdown, and a <br /> corrective action plan to insure similar shutdowns do no reoccur: <br /> Not Applicable. <br /> • Timelines for activities currently underway or proposed: <br /> Greyhound proposes to continue the groundwater monitoring and sampling <br /> program in accordance with all applicable LUFr and Tn-Regional requirements <br /> through the end of 1994 . <br /> SThe next groundwater sampling event will be in June 1994 with report submittal <br /> no later than July 15, 1994 <br /> LMU723823 221004 R3 <br /> 4 <br />