Laserfiche WebLink
c . Surface water samples - the first rain came <br /> early , before the plan was approved , and surface <br /> water samples from the south yard were taken <br /> as outlined in Attachment 3 of the revised <br /> work plan. Samples were taken on September 24 . <br /> A full report will be submitted when the <br /> results of the analysis are available . <br /> d . Monitor well tests - the results of the <br /> August samples were sent to the agencies <br /> on 9/29/86 . <br /> Regards , <br /> THE MARLEY COOLING TOWER CO . <br /> C�bjrx . <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB :mhr <br /> cc : Mr . Bob Fujii-CRWQCB <br /> Mr . Marvin Young-EPA <br /> Ms . Jeanine Jones-DOHS <br /> Ms . Laurie Cotulla-S . J .L .H.D . <br /> Mr . Larry Schaper-Black & Veatch <br /> Mr . Tom Hickey-Black & Veatch <br /> Mr . Richard Landon-Exec . , V.P . , MCTC <br /> Mr . Wayne Struchtemeyer-Sr . V.P . Mfg . , MCTC <br /> Mr . Tim Verhagen-Counsel , MCTC <br /> Mr . Hal Daley-Plant Mgr . , Stockton , MCTC <br />