Laserfiche WebLink
42, <br /> -Czzz:T—iv W ° <br /> MW-5 — <br /> F ' <br /> CA <br /> z <br /> 0 <br /> E SIDEWALK..-.------•-------------•--------------- 8 <br /> — --- <br /> --------------------------------------------------------------------------••-•.......... <br /> d' <br /> SOUTH CENTER STREET 3 <br /> CURRENT UNDERGROUND <br /> FUEL STORAGE TANKS PRODUCT ISLAND CM) <br /> Q SIDEWALK <br /> — <br /> ------------------------- <br /> SB-6 <br /> -----------------------SB-6 0 O <br /> MW 3 * MW-2 <br /> ` •--- SB-1 I LEGEND <br /> \ <br /> MW-2 <br /> OO GROUNDWAT£:R MONITORING WELL LOCATION <br /> FORMER UNDERGROUND < AND,DESIGNATION <br /> �\ SB-IO *SB-0 FUEL STORAGE TANKS O SB-3 SOIL BORING LOCATION AND DESIGNATION <br /> SB-3 <br /> STATION `-`...... I v MW-8 <br /> PROPOSED GROUNDWATER MONITORING WELL <br /> BUILDING _--- { <br /> LOCATION AND DESIGNATION <br /> \MW-4 ---- c7 <br /> SB-5 <br /> SB-7• <br /> I <br /> WASTE OIL `1 MW-1 <br /> TANK <br /> SB-2 0 <br /> i <br /> \ i <br /> 'J <br /> MW-6 Oo <br /> SCALE <br /> 0 40 80 FEET ^+ <br /> Z <br /> TITLE: <br /> SITE MAP a <br /> LQ <br /> PREPARED FOR: ra <br /> y <br /> CHEVRON SERVICE STATION 9-0557 Uj <br /> 139 South Center Street ="I <br /> tiT <br /> PACIFIC Stockton,California - <br /> ENVIRONMENTAL <br /> rf--: cm+ore m pw.. GROUP,INC. <br /> DATE: 9-18-96 PROJECT: 920-078.IA FIGURE: 2 <br />