My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:58:03 PM
Creation date
2/22/2019 2:29:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r <br /> Chevron. <br /> :`tftt rE {aEkll �;k AI HPs( � Chevron <br /> 5 <br /> ;.T C-T -41 F4 2-- 51 <br /> Chevron U.SA Products Company <br /> 6001 Bollinger Canyon Rd., Bldg. L <br /> P.O. Box 5004 <br /> October 24, 1994 San Ramon, CA 94583-0804 <br /> Site Assessment& Remediation Group <br /> Phone(510)842-9500 <br /> Ms. Mary Meays <br /> San Joaquin County Environmental Health <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> Re: Chevron Station#9-0557 139 South Center Street Stockton CA <br /> Attached.Workplan for Additional Site Assessment(GTI, 10/19/94) <br /> Dear Ms. Meays: <br /> Please find attached a workplan dated October 19, 1994, which was prepared by Chevron's <br /> consultant, Groundwater Technology Inc. (GTI). GTI's workplan describes the drilling, sampling, <br /> and subsequent analyses to be performed in association with the additional site assessment work <br /> that is proposed for the subject site. <br /> Chevron is prepared- to begin permitting the proposed borings/wells as soon as approval of the <br /> workplan is received from your agency. If you have any questions or comments, I can be reached <br /> at(510) 842-8695. <br /> Sincerely, <br /> Brett L. Hunter <br /> Environmental Engineer <br /> Site Assessment and Remediation <br /> Attachment <br /> cc: Elizabeth Thayer,Central Valley RWQCB,Sacramento, CA <br /> Tom Portele,Greyhound Lines, P.O. Box 660362, Dallas, TX 75266-0362 <br />
The URL can be used to link to this page
Your browser does not support the video tag.