My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:58:03 PM
Creation date
2/22/2019 2:29:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br /> 43 {y <br /> -the <br /> 94 €AY 2 Pli 2s 13 <br /> Chevron U.S.A.Products Company <br /> 2410 Camino Ramon <br /> April28, 1994 San Ramon,CA 94583 <br /> P.O.Box 5004 <br /> San Ramon,CA 94583-0804 <br /> Marketing Department <br /> Ms. Mary Meays Phone 510 842 9500 <br /> San Joaquin County Environmental Health <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> Re: --Chevron Station#9-0557,139 South Center Street, Stockton, CA <br /> Attached work plan addendum (GTI,4/26/94) <br /> Attached field.notes and analytical results(GTI,4/90) <br /> Dear Ms. Meays: <br /> Attached is a work plan addendum dated April 26, 1994, which was prepared by Chevron's <br /> consultant, Groundwater Technology Inc. (GTI), to'describe changes to their original work plan <br /> dated, April 12, 1994. The propo sed include the relocation of proposed soil borings to <br /> investigate soil at the south end of the-easterii pump.island and to investigate-.the northern portion <br /> of the former fuel tank pit in the vicinity of tank pit samples TP-3 and TP-317B. The addendum <br /> also describes the addition of two soil borings to investigate the south end of the western pump <br /> island and the former waste oil tank location. <br /> To complete your records of.previous site information I have attached copies of GTI's field data <br /> sheets and analytical results obtained during tank removal operations in.April and May, 1990. <br /> If you have any questions or comments,I can be reached at(510).842-8695. <br /> Sincerely, <br /> Brett L. Hunter <br /> Environmental Engineer <br /> Site Assessment and Remediation <br /> Attachments <br /> cc: Elizabeth Thayer,Central Valley RWQCB, Sacramento, CA <br /> Tom Portele, Greyhound Lines, Inc., P.O. Box 660362, Dallas, TX 75266-0362 <br /> flnryLt<� <br />
The URL can be used to link to this page
Your browser does not support the video tag.