Laserfiche WebLink
C•1 IV OF STOCKTON ttJ( pp, <br /> © WICE <br /> c. _i1 1ryGfit( �?E _ 11('r',lf #`} <br /> 1 ' r - <br /> A # <br /> DEPARTMENT OF PUBLIC WORKS 97 DEC 3 i pm f" O9 <br /> CITY HALL <br /> 425 N.EL DORADO STREET . <br /> STOCKTON,CA 95202-1997 <br /> I <br /> I . <br />{ <br /> December 19, 1997 <br /> Mandy Lauenroth <br /> Pacific Environmental Group w <br /> 11315 Sunrise Gold Circle, Suite M <br /> Rancho Cordova, CA 95742 <br /> REVOCABLE PERMIT REQUEST FOR GROUNDWATER MONITORING WELLS: <br /> The permitting process required .in the City of Stockton for installation of groundwater <br /> monitoring wells is a two phase process. First, a Revocable Permit must be issued, <br /> wherein the City grants permission to the-property owner to install and maintain a private <br /> well within the City's right-of-way. Second, an Encroachment Permit is issued which allows <br /> the actual construction of the well to be°carried out in our right-of-way. <br /> i <br /> In order to issue the Revocable Permit the City requires the following: <br /> 1. A formal written request fora.Revocable Permit,in which you acknowledge.that you <br /> have read and understand the City's Standard Conditions Applicable to Revocable <br /> Permits. An acceptable application form and copy of the Standard Conditions are <br /> enclosed. <br /> 2. A processing fee payable to the City of Stockton in the amount of$310.00. <br /> r , , <br /> 3. A detailed work plan including a sketch showing the location of the proposed well(s). <br /> t <br /> 4. A Faithful Performance Bond, or other acceptable form of financial security, in an <br /> amount of$500.00 per well will be required. This bond shall remain in effect for as <br /> long as the well remains in the City's right-of-way. <br /> 5. A certificate of insurance naming the City as additional insured. Insurance is <br /> required for the agency obtaining the Revocable Permit and the agency obtaining <br /> "STOCKTON...CALIFORNIA'S SUNRISE SEAPORT" <br />