Laserfiche WebLink
November 14, 1997 <br /> Page 2 <br /> j <br /> r November 14, 1997. The data in these reports are necessary to adequately assess site <br /> conditions and the laboratory certified copies of these reports are required " <br /> documentation of any analytical data reported. Upon receipt of the data several days <br /> will be necessary,to input, assess, review the dataand any resulting findings.. <br /> • Additionally, a work plan for further assessment was requested in the PHS/EHD <br /> October 27, 1997 letter to be included as part of PACIFIC's report. The scope of the <br /> work plan will be based on the findings of the report and therefore must be <br /> completed after the findings have been prepared. Several days may be necessary to <br /> prepare, review the work plan portion of the report, and to submit the entire <br /> document. <br /> PACIFIC assures yoiz that every reasonable effort is being made to expedite the Ft <br /> preparation of the report. Tfiank you for your understanding in this matter. <br /> If there are any questions regarding the,contents:of this letter,please call us at <br /> (916),858-2350. , <br /> Sincerely, , <br /> Pacific Environmental Group,Inc. <br /> Ro er Hoffm <br /> Project Geologist <br /> cc: Mr. BrettHunter, Chevron Products Company <br /> Ms. Elizabeth Thayer, Central Valley Regional Water Quality Control Board <br /> Mr,Tom Portele, Greyhound.Lines, P.O. Box 660362, Dallas TX 75266-0362 <br /> _ <br /> 920-078.1 A/EXTLTR2.'DOC <br />