My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:41:23 PM
Creation date
2/22/2019 2:29:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety Officer Fred Hayden <br /> The Site Safety Officer shall be responsible for the <br /> implementation of the site safety plan on site. Specific duties <br /> will include: <br /> monitoring the compliance of field personnel for the <br /> -routine and proper use of the PPE*�that has been <br /> designated for each task <br /> routinely inspecting PPE and clothing to ensure that it <br /> is in good condition and is being stored and maintained <br /> properly <br /> stopping work on the site or changing work assignments <br /> or procedures if any operation threatens the health and <br /> safety of workers or the public <br /> monitoring personnel who enter and exit the site and <br /> all controlled access points <br /> reporting any signs of fatigue, work-related stress, or <br /> chemical exposures to the Project Manager and/or Health <br /> and Safety Manager within 24 hours <br /> dismissing field personnel from the site if their <br /> actions or negligence endangers themselves, co-workers, <br /> or the public, and reporting the same to the Project <br /> Manager and/or Regional Safety Director within 24 . hours <br /> reporting any accidents or violations of the site <br /> safety plan to the Project Manager and/or Regional <br /> Safety Director within 24 hours . <br /> knowing emergency procedures, evacuation routes and the <br /> telephone numbers of the ambulance, local hospital, <br /> poison control center, fire and police departments <br /> - ensuring that all project-related personnel have signed <br /> the personnel agreement and acknowledgments form <br /> contained in this site safety plan <br /> coordinate upgrading and downgrading of PPE with the <br /> Health and Safety Manager, as necessary, due to changes <br /> in exposure levels, monitoring results, weather, and <br /> other site conditions <br /> perform air monitoring with approved instruments in <br /> accordance with requirements stated in this Site Safety <br /> Plan (see monitoring procedures on page 17 for specific <br /> information) <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.