My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:41:23 PM
Creation date
2/22/2019 2:29:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nl fEDIATE OSHA LNSPECTION STEPS <br /> ♦ Identify the Inspector. <br /> (a) Ask to see credentials. <br /> (b) Write down the relevant information, including the inspector's name, agency <br /> affiliation, address, telephone number and the statutory authority under which the <br /> inspecrion is being conducted. <br /> (c) If any doubts, call OSHA office to verify the visit. <br /> (d) If inspection occurs at a project site, ask for written certification of medical <br /> monitoring (including respiratory evaluation) and for 40 hour hazardous waste training <br /> certification. No one may venture out of the clean zone without it. DOUBLE CHECK <br /> it with his/her office if in doubt. <br /> ♦ Notify the Health and Safety Manager and Project Manager immediately; they must <br /> be present for the opening meeting and inspection. <br /> ♦ The Project Manager should notify the District Manager. <br /> ♦ The Health and Safety Manager should notify Corporate Health and Safety (EID). <br /> ♦ Take notes on: <br /> (a) What is said <br /> (b) What is seen <br /> (c) Who spoke to whom <br /> (d) Any sample or copies taken <br /> (e) Any corrective actions done in the inspector's presence (do whenever possible) <br /> (f) Any activity, including where, when, who, and what <br /> (g) Any other occurrence, even if seemingly minor <br /> ♦ When..in doubt on any question, do not bluff an answer. Ask the inspector to put the <br /> question in writing, addressed to company counsel.. Never lie, even by omission; jail <br /> can be the penalty. <br /> ♦ If inspection occurs on site, carefully review the Site Safety Plans with the Inspector. <br /> Remind him that GTI is not the property owner. <br /> ♦ If inspection occurs at an office, have accident reports, OSHA 200 logs ready at all <br /> times for inspection. Always make sure OSHA poster is visible. If employees report <br /> to a site (not the office), an OSHA poster must be present. <br /> ♦ Determine the scope of the inspection: Ask the OSHA inspector what areas of the <br /> company activity are of interest and the reason for the inspection. Discover what has <br /> triggered the inspecdon. If complaints initiated the inspection, find out specifically what <br /> they were. <br /> n,ao"P-72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.