My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:41:23 PM
Creation date
2/22/2019 2:29:40 PM
Metadata
Fields
Template:
EHD - Public
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ed . ,t February 13, 1998 ' <br /> Page 2 <br /> Laboratory Procedures <br /> Selected soil samples and groundwater samples collected will be analyzed for the <br /> presence of total petroleum hydrocarbons calculated as gasoline, benzene, toluene, <br /> ethylbenzene, and xylenes using modified EPA Methods 8015 and 8020. <br /> Soil Cuttings and Rinsate Water <br /> Soil cuttings generated during drilling operations will be temporarily stored onsite on <br /> and covered with-plastic sheeting pending characterization and disposal. Soil cuttings <br /> will be removed by Chevron's disposal contractor to an appropriate disposal facility. <br /> Water generated during steam cleaning, and sampling of the borings will be temporarily <br /> stored in DOT-approved 55-gallon drums pending transport by Chevron's disposal <br /> contractor to an appropriate disposal or treatment facility. <br /> 7G007-013-01/workplan <br /> i <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.