My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:41:23 PM
Creation date
2/22/2019 2:29:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan for Additional Soil and Groundwater Assessment 3 <br /> Chevron U.S.A. Products Company, 139 South Center St.,Stockton,CA October 19, 1994 <br /> Task 3: Groundwater Monitoring Well Installation/Development <br /> The off-site groundwater monitoring well will be constructed of 2-inch-diameter polyvinylchloride <br /> (PVC) casing and 0.020-inch-slot PVC well screen. The well screen will be installed from <br /> approximately 35 feet BGS to 60 feet BGS. A sand filter pack will be placed within the annulus of <br /> the well from the bottom of the borehole to approximately 2 feet above the top of the well screen. <br /> The annulus will be sealed with approximately 2 feet of bentonite on top of the sand, and a portland <br /> cement/bentonite grout to the surface. The well heads will be protected by a locking cap and a <br /> traffic-rated, watertight street box set in concrete. <br /> Prior to the next scheduled groundwater monitoring and sampling event, the new groundwater <br /> monitoring well will be developed by surging and bailing to remove fines from the well and sand <br /> pack. Periodic measurements of pH, conductivity and temperature will be collected during <br /> development. The well will be developed until well water is visibly clear. <br /> Top of casing (TOC) and horizontal position of the well will be professionally surveyed relative to an <br /> established local bench mark or an arbitrary on-site datum. <br /> Task 4: Report Preparation <br /> Groundwater Technology will prepare a report summarizing the data collected under the scope of <br /> work detailed above. The report will document the methods and results of the work, summarize <br /> laboratory analytical results, and include appropriate maps. <br /> 066BASGB.WKP(CHV-54) - <br /> ❑❑J GROUNDNAATER <br /> ❑�❑ TECHNOLOGY <br />
The URL can be used to link to this page
Your browser does not support the video tag.