Laserfiche WebLink
Mw-3 IV <br /> MW-4 PRESENT UNDERGROUND= <br /> USED OIL STORAGE TANK i <br /> TANK <br /> - <br /> SB-5 I I I V <br /> / I I <br /> OZ <br /> < I/ N CIO <br /> / SB—3 <br /> SB-2 r—Ir�r-� - 56-1 <br /> 4— <br /> t+� I II II I i <br /> FORMER UNDERGROUND I II I L J <br /> / STORAGE TANKS <br /> SB-4 MW-2 1 <br /> I II I <br /> - MW-6 / M- <br /> WASHINGTON ST. <br /> LEGEND <br /> t MONITORING WELL MW-5 <br /> SOIL BORINGS DRILLED <br /> 5/12-13/94 <br /> I t <br /> I <br /> PROPOSED ANGLED (30' PAST- VERTICAL) I I <br /> SOIL BORING SHOWING DIRECTION OF <br /> PROPOSED BOREHOLE 5 J FREEWAY (ELEVATED) <br /> O PROPOSED SOIL BORING (VERTICAL) <br /> PROPOSED GROUNDWATER <br /> MONITORING WELL <br /> GROUNDWATER o FEET 40 SITE PLAN <br /> TECHNOLOGY SCALE <br /> CLIENT: FILE: PROJECT NO.: PM PE/RG <br /> CHEVRON U.S.A. PRODUCTS CO. 3983SMA (1:40) 02070-3983 r, <br /> SERVICE STATION NO. 9-0557 V. liC/d <br /> LOCATION: F URE: <br /> 139 SOUTH CENTER STREET DES. DET. DATE: i <br /> STOCKTON, CALIFORNIA DSB I SP 10-17-94 <br />