Laserfiche WebLink
1 <br /> C. ON-SITE WORK PLANS: <br /> Project Objectives: Excavate contained soils-to a <br /> depth of 5 feet beyond construction lids. <br /> -�$G3iI s—S 3 <br /> Work tasks (with proposed timetables) : <br /> Task 1: Drilling/Soil Boring <br /> Dependent _on 'excavation <br /> Task 2 : Excavation/Trenching <br /> A S A P (1 day project) <br /> Task 3 : Monitoring well installation <br /> Subsecruerit to drillincr <br /> Task 4 : Well Gauging <br /> Subsequent to drilling <br /> Task 5: Well Development' <br /> Subsequent to drilling <br /> Task 6: Groundwater sampling <br /> Subsequent to drilling <br /> Task 7 : Soil Sampling <br /> Task 8• <br /> 7 <br />