Laserfiche WebLink
I <br /> I ilium <br /> 1402216MW.docMW 1 <br /> April 11,2014 l <br /> Page 2 of 4 <br /> In accordance with General Provision No. 6, SEVEN WORKING DAYS PRIOR to the start of <br /> this work,Permittee shall notify the State Representative JOSEPH A. VALDEZ, P.O. Box 2048 <br /> Stockton, CA 95201, (209) 948-3656. All work requiring traffic control must apply for a <br /> closure number seven days prior to start of work. No closures on HOLIDAYS or <br /> WEEKENDS. All work under thisermit must ust meet with the approval of the State <br /> Representative. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation of this <br /> permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, <br /> PERMITTEE SHALL FILL OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY <br /> GRANTOR. <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in'the State Standard Specifications shall include <br /> State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, and <br /> Business and Professions Code, Section 8771. Permittee shall physically inspect the work site <br /> and locate survey monuments prior to work commencement. Monuments shall be referenced or <br /> reset in accordance with Business and Professions Code. <br /> A pre-job conference with the Permittee, Contractor, and State Representative maybe required <br /> prior to start of work. Permittee shall contact the State Representative and arrange the meeting. <br /> This meeting may be waived at the discretion of the State Representative. <br /> Permittee shall, prior to commencement of any work, provide the State Representative with the <br /> name and phone number of the person in responsible charge of the work to be performed <br /> under this permit. <br /> In accordance with Section 6500 of the Labor Code, a Cal-OSHA permit is required prior to the <br /> start of work. <br /> The general area in the vicinity of the proposed permit work may be environmentally sensitive. <br /> All mitigation and related work, in accordance with. General Provision No. 26, is the <br /> responsibility of the Permittee. <br /> In addition to the attached General Provisions, the following special provisions are also <br /> applicable for installation and monitoring of groundwater monitoring wells: <br /> f <br /> 1. Unless specifically authorized elsewhere in this permit, survey work shall not be performed: <br /> A. On holidays or an afternoon proceeding a holiday. <br /> B. In medians. <br /> C. When work requires traffic control�on lanes. <br /> I <br /> 1 2 <br />