Laserfiche WebLink
STATE OF CALIFORNIA-HEALTH AND WELFARE AGENCY GEORGE DEUKMEJIAN, G.,m , <br /> DEPARTMENT OF HEALTH SERVICES <br /> TOXIC SUBSTANCES CONTROL DIVISION <br /> REGION I Vj .` <br /> 4250 POWER INN ROAD <br /> SACRAMENTO,CA 95826 <br /> 1916)739-3145 _ <br /> March 9, 1989 <br /> Mr. David Bates <br /> Chief Production Engineer : Ll iQg <br /> The Marley Cooling Tower Company \SPR <br /> 5800 Foxridge Drive <br /> Mission KS 66201 <br /> Dear Mr. Bates: <br /> TRANSMITTAL OF COMMENTS AND RECOMMENDATION ON THE PHASE IV GROUND <br /> WATER ASSESSMENT REPORT <br /> The Department of Health Services has reviewed the "QUARTERLY <br /> GROUNDWATER MONITORING AND INTERIM RESULTS OF PHASE IV <br /> GROUNDWATER ASSESSMENT" , dated February 2 , 1989 . We are also in <br /> receipt of the Regional Water Quality Control Board' s (Board' s) <br /> letter dated 24 February 1989 transmitting their comments and <br /> recommendations. <br /> The report in general seems to be thorough and was well written. <br /> There are a few issues however which do need to be resolved. <br /> Some of these are addressed in the attached memo from Jim <br /> Austreng, others are addressed in John Tomko' s memo dated 24 <br /> February 1989 : Both memos are enclosed. <br /> I do want to emphasize that the Department is very concerned with <br /> the North Yard "mound" . I therefore suggest the MCTC include in <br /> the Phase V work schedule sufficient investigative activities <br /> necessary to determine the origin and consequences (both actual <br /> and potential) of the "mound" . <br /> As for the remaining issues, the Department requests that all <br /> comments and recommendation presented in the attached memos be <br /> incorporated into the detailed Phase V Workplan. Note: The <br /> Department had requested in a February 10, 1989 (certified) <br /> letter to Mr. Verhagen, that a detailed Phase V Workplan be <br /> submitted by March 1, 1989 . Because of recent changes however in <br /> the scope of work and because of our pending meeting scheduled <br /> for March 14, 1989, the Department will extend the Phase V <br /> Workplan submittal deadline to March 20, 1989 . <br /> The Department is looking forward to seeing you on the 14th of <br /> March. We anticipate the need for close coordination between <br />