My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OK CALIFORNIA <br /> GEORGE DEUKMIJIAN Gn., <br /> CALIFORNIA REGIONAL ER QUALITY CONTROL BOARD— --�' <br /> CENTRAL VALLEY REGION <br /> 3dG3R0UT1ERR0AD <br /> SACRAMENTO,CA 95027-3008 <br /> MAR _ 24 February 1989 <br /> Mr, David Bates Eti <br /> Marley Cooling Tower Company <br /> 500 Foxridge Drive <br /> Mission, KS 66201 <br /> POND CLOSURE PLAN AND COMMENTS ON THE PHASE IV GROUND WATER ASSESSMENT, MARLEY <br /> COOLING TOWER COMPANY, SAN JOAQUIN COUNTY <br /> Regional Board staff have reviewed the "Surface Impoundment Closure and Post- <br /> Closure Plan" , submitted on 6 February 1989, and the "Quarterly Ground Water <br /> Monitoring and Interim Results of Phase IV Ground Water Assessment" report, <br /> submitted on 8 February 1989. <br /> The closure and post-closure activities planned for the storm water impoundment <br /> appear to be sufficient to protect ground and surface waters . The Boards <br /> previomments on <br /> datedo141Juned1988sed andc20 December h1988,�dhavesbeen partiaillyresolvedto youiwithtthis <br /> submittal of the Closure Plan revision. The only outstanding comment is that the <br /> Board would like to review the construction plans and technical bid specifications <br /> for the impoundment closure, including the Construction Quality Assurance (CQA) <br /> procedures. The construction plans and specifications should be submitted prior <br /> / to the Request for Bids, so that any potential revisions can be made prior to the <br /> release of the documents for bidding. <br /> In addition, the Board requests submittal of all CQA test results , monthly <br /> progress reports, as-built plans and specifcaticns , ground water monitoring <br /> results, the annual post-closure reports, and any revisions to the Closure and/or <br /> Post-Closure Plans, <br /> Enclosed is a memorandum regarding staff' s review of the Phase IV around water <br /> assessment report. Please incorporate staff' s recommendations regarding future <br /> around water assessment activities into your program. <br /> If you have any questions, please contact John Tomko at (916) 361-5610. <br /> 1-4 <br /> RY A, : EER NTS <br /> Senior Engineer <br /> JJT:e,) <br /> Enclosure <br /> cc: Messrs. James Austreng and Duane Gelster, Department of Health Services, <br /> Sacramento <br /> Ms. Laurie Cotulla, San Joaquin County Health District, Stockton <br /> Mr. Torn Hickey Black & Veatch Missouri <br /> Mr. Peter Quinlan, Hargis and kssociates, Inc . , La Jolla <br />
The URL can be used to link to this page
Your browser does not support the video tag.