Laserfiche WebLink
OP E C I A L P R O V I �I O N S <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish <br /> ull-time supervision of all work, to insure full compliance <br /> with the permit provisions. <br /> 2. START OF WORK: No work within the County right of way shall <br /> e started-until the utility company representative has made <br /> an evaluation of weather conditions and has determined the <br /> work can be accomplished under the provisions Of the permit. <br /> 3. CLEAN PAVEMENT : Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed onto the road travelway shall be removed immediately. <br /> 4 . DAILY RESTORATION: Private driveways and road intersections <br /> shall a restore daily. <br /> 5. WEATHER-TIGHT CONDITION: All trenches shall be filled and <br /> compacte , itc es an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain. <br /> f <br /> i <br /> Engineering Form 1] <br /> 5/79 <br /> i <br />