My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OP E C I A L P R O V I �I O N S <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish <br /> ull-time supervision of all work, to insure full compliance <br /> with the permit provisions. <br /> 2. START OF WORK: No work within the County right of way shall <br /> e started-until the utility company representative has made <br /> an evaluation of weather conditions and has determined the <br /> work can be accomplished under the provisions Of the permit. <br /> 3. CLEAN PAVEMENT : Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed onto the road travelway shall be removed immediately. <br /> 4 . DAILY RESTORATION: Private driveways and road intersections <br /> shall a restore daily. <br /> 5. WEATHER-TIGHT CONDITION: All trenches shall be filled and <br /> compacte , itc es an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain. <br /> f <br /> i <br /> Engineering Form 1] <br /> 5/79 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.