Laserfiche WebLink
MARLEY COOLING TOWER COMPANY <br /> STOCKTON, CALIFORNIA FACILITY <br /> POND CLOSURE <br /> CONTRACT NO. 5 <br /> ADDENDUM NO. 3 <br /> JUNE 15, 1989 <br /> A. SCOPE. This Addendum No. 3 consists of pages AD3-1 thorough AD3-3, <br /> and covers the following additions and changes to the specifications, <br /> drawings, and construction quality assurance plan for this project. <br /> B. SPECIFICATIONS <br /> 1. Section 1C - QUALITY CONTROL <br /> Page 1C-2, Paragraph 1C-2. Add the following to the TESTING <br /> SCHEDULE: <br /> Item Frequency Responsible Partv <br /> "Decontamination 1 sample/ Owner " <br /> Verification equipment piece, <br /> As, Cu, Cr minimum <br /> 2. Section 2D - DISPOSAL AREA CONSTRUCTION <br /> Page 2D-4, Paragraph 2D-4.03.01. Change the Typical Value for <br /> "Belltest, hours" from 750 to 1500. <br /> Pages 2D-5 and 2D-6, Paragraph 2D-4.04.01. Delete the table on <br /> physical properties of HDPE and replace with the following table: <br /> Physical Test <br /> Property Method Requirement <br /> Thickness, mils minimum 60 <br /> Specific Gravity (minimum) ASTM D 792 0.940 <br /> Method A <br /> Minimum Tensile Properties ASTM D 638 <br /> (each direction) <br /> Tensile Strength Yield 140 <br /> (lb/in. width) <br /> Tensile Strength at Break 240 <br /> (lb/in. width) <br /> AD3-1 <br />