My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLACK & VEATCH <br /> ENGINEERS-ARCHITECTS TEL. (913) 339-2000 <br /> � J <br /> 1500 MEADOW LAKE PARKWAY <br /> . MAILING ADDRESS P.O. 80X NO.8405 <br /> KANSAS CITY,MISSOURI 64114 <br /> Marley Cooling Tower Company B&V Project 11654.330 <br /> Stockton, California Facility B&V File G-5.0 <br /> Pond Closure - Contract No. 5 July 6, 1989 <br /> Martech Construction, Inc <br /> Environmental Services Division <br /> 4212 North Freeway Blvd. ; Suite 2 <br /> Sacramento, CA 95834 <br /> Attention: Mr. Don Litchfield, Division Manager <br /> Dear Mr. Litchfield: <br /> In accordance with our discussion on this date, the following modification <br /> to the Contract No. 5, Pond Closure Specification will be included in <br /> future Change Order No. 1: <br /> Section lA - PROJECT REQUIREMENTS <br /> Page 1A-3. Paragraph 1A-9. Delete the following from the last <br /> sentence of the first subparagraph: <br /> " (Except Owner's employees)" <br /> This change will remove any inconsistency with the requirements in Sections <br /> SC-10, 1A-3, and 1D of the specifications. It is the intent of the <br /> contract documents that the Contractor shall be solely responsible for <br /> implementation of the Health and Safety Plan, and the subsequent protection <br /> of personnel within the established construction boundaries. <br /> Please c W <br /> us if there are any questions. <br /> Very truly yours, <br /> BLACK & VEATCH <br /> 6Zy J `"� <br /> Gary J. Schnettgoecke <br /> VAP:mrp <br /> cc: Mr. Dave Bates, MCTC Mr. Val Siebal, DHS <br /> Mr. Tom Kroehle, MCTC Mr. Ron Valinoti, SJEHD� <br /> Mr. T.J. Verhagen, TMC Mr. Gary Reents, CVRWQCB <br /> Mr. Duane Gelster, DHS Mr. Jeff Zelikson, USEPA <br /> Mr. Charles White, DHS Mr. L.T. Schaper, B&V <br />
The URL can be used to link to this page
Your browser does not support the video tag.