My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> R or <br /> AS <br /> �� PERen <br /> June 5, 1989 <br /> Mr. Jim Austre g <br /> Department o H alth Ser ces <br /> Toxic ubst nces Cont Division <br /> 4250 Po a Inn Roa <br /> Sacramento, California 95826 <br /> RE: Progress Report April and May, 1989 <br /> Dear Mr. Austreng: <br /> The following is a report of the activities related to <br /> the Stockton site during April and May, 1989. <br /> A. Phase IV Groundwater Assessment. <br /> A meeting was held May 25, 1989 with the State <br /> agencies to review status and future work on <br /> Phase IV Groundwater Assessment. The <br /> quarterly samples taken the week of April 17, <br /> 1989 will be included as part of the RI/ FS. <br /> The Lysimeter data taken during the same week <br /> is attached. <br /> B. Storm Water Retention Pond. <br /> Bids have been received fromlfive ( 5) <br /> contractors and are currently being evaluated. <br /> The contractor will be" selected and bid <br /> awarded by June 15, 1989 with construction <br /> scheduled to start by July 5, 1989. <br /> C. Community Relations Plan. <br /> The revised Community Relations Plan dated <br /> April, 1989 has been approved in a letter <br /> dated April 28, 1989-Sue Sher to David W. <br /> Bates. <br /> MARLEY <br /> the 4 <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.