My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2F-2, Paragraph 2F-4.01. Replace entire paragraph beginning <br /> "Rinsate samples will be analyzed. . .", with the following: <br /> "Rinsate samples will be verified by Owner using analytical <br /> procedures established by the U.S. EPA and accepted by the <br /> California DHS for one or more of the indicator parameters <br /> listed below. <br /> The following concentrations of indicator parameter shall be <br /> used to verify decontamination: <br /> Indicator Parameter Concentration, maximum <br /> Copper, as Cu 65 ug/1 <br /> Total Chromium, as Cr 50 ug/l <br /> Total Arsenic, as As 50 ug/1" <br /> 11. Section 3A - CAST-IN-PLACE CONCRETE <br /> Page 3A-4, Paragraph 3A-11. Replace entire paragraph with the <br /> following: <br /> 113A-11. TESTS. Tests, as required herein, shall be made by <br /> and at the expense of the Owner. Tests for slump and air <br /> content shall be made in accordance with ACI 30, ASTM C143, <br /> and ASTM C231, respectively. Tests for slump and air <br /> content shall be performed on each truckload of concrete <br /> placed for the perimeter curb and gutter. All field <br /> testing (slump and air content), and the compression test <br /> specimens shall be the responsibility of the testing <br /> laboratory selected by the Owner. <br /> A set of three compression test cylinders shall be made from <br /> each truckload of concrete placed for the perimeter curb and <br /> gutter. One cylinder shall be broken at the age of 7 days, <br /> another at 28 days, and the third will be held in reserve <br /> and tested only at the direction of the Engineer. The <br /> compression test samples shall be made and cured in <br /> accordance with ASTM C31 and tested in accordance with ASTM <br /> C39. <br /> If the 28-day strength of a test cylinder is less than 4,000 <br /> psi, the reserve test cylinder shall be tested. The average <br /> strength of the two 28-day breaks shall be 4,000 psi or <br /> greater for the structure to be accepted." <br /> AD2-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.