My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:00:31 PM
Creation date
2/22/2019 2:39:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1990
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. <br /> FOR <br /> THE MARLEY COOLING TOWER COMPANY <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> INTERIM PLANT STARTUP MONITORING <br /> The Interim Plant startup includes batch and continuous operation phases. The <br /> initial three batches of treated water shall be sampled for the parameters <br /> listed below. The influent and effluent sampling of the continuous operation <br /> phase of startup shall include, for a minimum of three consecutive days of <br /> compliance with discharge limitations, the following analyses: <br /> Constituents Units Type of Sample Frequency <br /> Total Chromium ug/l HACH DR3000 Every 4 hrs. <br /> Total Chromium ug/l 24-hr composite Daily <br /> Hexavalent Chromium ug/l HACH DR3000 Every 2 hrs. <br /> Hexavalent Chromium ug/l 24-hr composite Daily <br /> Copper ug/l HACH DR3000 Every 4 hrs. <br /> Copper ug/l 24-hr composite Daily <br /> Arsenic ug/l 24-hr composite Daily <br /> TDS mg/l 24-hr composite Daily <br /> Ph Ph Units Probe Every 2 hrs. <br /> FULL SCALE OPERATIONS <br /> INFLUENT MONITORING <br /> Influent samples shall be collected from the inlet piping to the treatment <br /> plant flow equalization basin. Influent samples shall be representative of <br /> the volume and nature of the inflow. The following shall constitute the <br /> influent monitoring program: <br /> Constituents Units Type of Sample Frequency <br /> Total Chromium ug/l 24-hr composite Daily <br /> Hexavalent Chromium ug/l 24-hr composite Daily <br /> Copper ug/l 24-hr composite Daily <br /> Arsenic ug/l 24-hr composite Daily <br /> TDS mg/l 24-hr composite Daily <br />
The URL can be used to link to this page
Your browser does not support the video tag.