Laserfiche WebLink
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362.1818 <br /> Lune 6. 1990 RECEIVED <br /> J U N 1 3 1990 <br /> ENVIRONMENTAL HEALTH <br /> Mr . Jim Austreng PERMIT/SERVICES <br /> [)La rtme"nt- of­,Heal th Services <br /> Tc 6bstance`s` Control Division <br /> 11/Croydon Way <br /> Sacramento . California 95827 <br /> RE: Progress Report February , March , April & May , 1990 <br /> Dear Mr . Austreng : <br /> As a result of an oversight no report was filed in April <br /> for the February—March period . This report covers the period <br /> from February . 1990 to May , 1990 for the activities at the <br /> Stockton site . <br /> A. Groundwater Monitoring. <br /> The quarterly Groundwater Monitoring Report was <br /> completed on March 2nd and sent to the Department <br /> of Health Services and California Regional Water <br /> Quality Control Board . This was for the January , <br /> 1990 sampling . The analysis of the samples taken <br /> from the lysimeters was sent under separate cover <br /> on March 2, 1990. <br /> The samples for the 2nd quarter of 1990 were taken <br /> the week of April 23rd . The results from the <br /> lysimeter are attached . The Groundwater Monitoring <br /> Report is not yet complete . <br /> With the groundwater flow moving more to the east , <br /> because of the heavy pumping of the wells east of <br /> the site , additional monitor wells will be con— <br /> structed in the field to the east of the north <br /> Yard and on Main Street , near Del Mar Ave . This <br /> should take Place in late June . <br /> No progress has been made to gain access to the <br /> private property to the south of Main Street . The <br /> access is needed to install the monitor wells to <br /> establish the southeast edge of the plume . <br /> MARLEY <br /> the 4 <br /> COOLING TOWER <br /> company <br />