My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLACK & VEATCH <br /> 8400 Word Parkway,P.O.Box No.8405,Kansas City,Missouri 64114,(913)339w2000 <br /> Marley Cooling Tower Company B&V Project 11654.900 <br /> Stockton, California August 26, 1991 <br /> Mr. James Austreng <br /> Deptartment of Health Services <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827-2106 <br /> Dear Mr. Austreng: <br /> On behalf of the Marley Cooling Tower Company, I am requesting <br /> extensions to the schedule for completing Remedial Action construction <br /> as discussed in detail during our meeting on August 20, 1991. The <br /> construction of the full scale subsurface flushing system and the final <br /> expansion of the water treatment plant will follow the schedules <br /> indicated in the attachments to this letter. The schedule for the <br /> flushing system construction includes an allowance for an Agency review <br /> period as you requested. Please contact me or Mr. David Bates with any <br /> questions or comments. <br /> Very truly yours, <br /> BLACK & VEATCH �/�7 � <br /> v V" / a. w-,&, <br /> Thomas A. Hickey <br /> TAH/kg (/ <br /> Enclosures <br /> cc: Ms. Camilla Williams , w/enclosures <br /> Mr. David Bates <br /> Mr. Tim Verhagen <br /> Mr. Larry Schaper <br />
The URL can be used to link to this page
Your browser does not support the video tag.