My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION SHEET -2- <br /> MARLEY COOLING TOWER COMPANY <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> River below Bellota. From 1 October to 1 April every year, the East Stockton <br /> Water District dams the Calaveras River at its fork with Upper Mormon Slough, <br /> thus diverting all flows through Upper Mormon Slough and the Stockton <br /> Diverting Canal . <br /> From 1 April to 1 October every year, flows are split between the Calaveras <br /> River and Upper Mormon Slough. A series of check dams are installed along the <br /> Calaveras River, Upper Mormon Slough, and the Stockton Diverting Canal to <br /> provide irrigation water for adjacent farmers. During this time, there are <br /> periods of no flow in the Stockton Diverting Canal . <br /> MCTC submitted a Report of Waste Discharge (RWD) which requested an increase <br /> in the treated water flow from the treatment plant. MCTC proposed in the RWD <br /> an expansion of the on-site ground water treatment facility to control <br /> contaminant movement. An electrochemical reduction and precipitation <br /> treatment plant will be expanded and used in parallel with the existing ion <br /> exchange treatment system. Flows have been proposed to be increased to a <br /> maximum of 1 .01 mgd (0.72 mgd average) . Ground water treatment will consist <br /> of various combinations of the following unit processes: flow equalization, <br /> reduction, precipitation, settling, filtration, pH adjustment and ion <br /> exchange. <br /> A Remedial Investigation / Feasibility Study has been conducted and in <br /> August 1990, the final Remedial Action Plan (RAP) was adopted by the DHS. The <br /> recommended ground water remedial action in the RAP included an increase to <br /> 0.72 mgd in the discharge of the treated ground water and/or storm water. <br /> A revised monitoring program has been prepared for the new plant. The <br /> adoption of the modified waste discharge requirements will expedite ground <br /> water cleanup by increasing flows. <br /> Basis for Effluent Limitations <br /> Effluent limits on the discharge to the Stockton Diverting Canal are based on <br /> water quality objectives established by the "California Inland Surface Waters <br /> Plan" . Limits were set at 6.5 pg/l for Copper, 11 pg/l for Hexavalent <br /> Chromium, and 10 pg/1 for Arsenic, for protection of freshwater aquatic life. <br /> Limits were set at 50 Ng/l for Total Chromium for protection of human health <br /> and the recommended upper level for protection of human health for Total <br /> Dissolved Solids at 1000 pg/l . The TDS of the natural groundwater extracted <br /> ranges from 330 - 860 mg/l and an increase of approximately 300-500 mg/l can <br /> be attributed to the treatment process. Although an effluent concentration of <br /> 500 mg/l TDS is the Basin Plan Objective, it is believed to be in the best <br /> interest of the people of California to allow a higher discharge concentration <br /> in order to facilitate the cleanup of the contaminated ground water. <br />
The URL can be used to link to this page
Your browser does not support the video tag.