My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' TABLE 6 <br /> RECLAMATION WELL PUMPING RATES <br /> ' FEBRUARY-MAY 1993 <br /> ' INSTANTANEOUS AVERAGE <br /> PUMPING RATE(a) PUMPING RATE(b) <br /> RECLAMATION WELL IDENTIFIER (qpm) (qpm) <br /> ' Laver 1 (100-Foot Sand) <br /> I-1 (MW-3) 41 19 <br /> tLaver 2 (Intermediate Zone) <br /> I-2 (MW-424) 20 36 <br /> I-3 (MW-427) 108 54 <br /> ' I-4 (MW-429) 0 34(c) <br /> I-5 (MW-436) 95 UTD(d) <br /> I-6 (MW-439) 90 62 <br /> 1 I-7 (MW-213) 20 4 <br /> ' I-8 (MW-214) 42 4 <br /> I-9 (MW-321) 62 26 <br /> I-10 (MW-324) 81 41 <br /> ' Laver 3 (Deep Zone) <br /> D-1 (MW-363) 9 4 <br /> D-2 (MW-461) 11 8 <br /> ' TOTALS: 579 292 <br /> ' (a) Instantaneous pumping rate recorded during groundwater sampling <br /> ' during the period April 27 through May 6, 1993 <br /> (b) Average pumping rate estimated from totalizer data recorded <br /> at the wellhead during the period February 2 through April 2, 1993 <br /> ' (Hargis + Associates, Inc. , 1993) <br /> (c) Reclamation well I-4 was not recommended for remedial wellfield <br /> pumping (Table 2) ; this well is pumped as a backup well when <br /> reclamation wells are out of service <br /> ' (d) Unable to determine due to inconsistency of totalizer data recorded <br /> at the wellhead <br /> gpm = Gallons per minute <br /> UTD = Unable to determine o\ver37tb6.700 <br /> ' �= HARGIS+ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.