Laserfiche WebLink
Well I .D. Pumping Rate <br /> (GPM) <br /> I-1 40 <br /> 1-2 Y0 <br /> 1-3 80 <br /> I-4 Pump Off <br /> 1-5 90 <br /> I-6 90 <br /> 1-7 10 <br /> 1-8 40 <br /> I-9 _ 70 <br /> I-10 80 <br /> D-1 12 <br /> D-2 10 <br /> 550 gpm. <br /> These rates will be adjusted as necessary to maintain <br /> the flow rate and chromium concentration. The shallow <br /> wells are dry and not being pumped at this time . <br /> B_ Soil_Flushing_ <br /> The report of the capture zone of 1-8 and the <br /> "Operating Description and Monitoring Plan" were <br /> released February 17 , 1993 . <br /> C_ NPDES Permit <br /> The draft report is being reviewed. The current <br /> schedule is to submit the permit for approval at the <br /> Board meeting in May . <br /> Sincerely , <br /> THE MARLEY COOLING TOWER CO. <br /> David W. Bates <br /> Chief Production Engineer <br /> a 1.,. <br /> DB/j e! ,as <br /> cc ' s : William Ryan- DTSC A4;g "Val Siebal-DTSC <br /> Ronald Valinoti-SJEHIP" Cori Condon-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Howard Rinne-Stockton Tom Hickey-Black & Veatch <br /> File <br />