Laserfiche WebLink
fi • <br /> S . Soil_ Ffushi_ng <br /> A test to determine the capture zone of well 1-8 was <br /> run during the November quarterly monitoring . A <br /> draft report is complete and should be released to <br /> the state agencies the week of 2/8/93 . <br /> A revised "Operating Description and Monitoring <br /> Plan" is in final draft and should be released the <br /> week of 2/15/93 . <br /> C. NPDES Permit <br /> The draft is being reviewed and rewritten. <br /> Sincerely , <br /> THE MARLEY COOLING TOWER CO, <br /> �� Q a <br /> David W. Bates <br /> Chief Production Engineer <br /> DBlief <br /> cc ' s : William Ryan- DTSC Val Siebaf-DTSC <br /> Ronald Valinoti-SJE-HD Cori Condon-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Howard Rinne-Stockton Tom Hickey-Black d Veatch <br /> File <br />