My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11A-6.02. Impeller. The impeller shall be a one-piece casting <br /> completely machined on all exterior surfaces, and statically balanced. <br /> The interior water passages shall have uniform sections, smooth <br /> surfaces, and be free from cracks and porosity. The impeller shall be <br /> securely locked to the shaft so it will not be loosened by reverse <br /> rotation, but it shall be readily removable. <br /> Pumps shall be selected such that the impeller size, at the stated <br /> design conditions, is not greater than 85% of the maximum diameter <br /> impeller for that pump. <br /> 11A-6.03. Shaft and Shaft Sleeves. The shaft shall be completely <br /> machined. Deflection at the stuffing box shall not exceed 0.002 inch at <br /> any head in the operating rage. A suitable splash deflector shall be <br /> mounted on the shaft adjacent to the frame bearing housing. <br /> The shaft shall be provided with a replaceable sleeve extending from the <br /> impeller through the stuffing box. The sleeve shall be positively <br /> secured to the shaft and shall be sealed to prevent leakage between the <br /> shaft and the sleeve. After assembly on the shaft, total runout shall <br /> not exceed 0.002 inch. <br /> 11A-6.04. Stuffina Box. The stuffing box for the pumping unit shall <br /> contain a single mechanical seal . <br /> 11A-6.05. Frame Assembly. The frame assembly shall rigidly support the <br /> rotating element with two bearings. The outboard bearing shall carry <br /> both axial and radial pump loads. The assembly design shall permit <br /> axial adjustment of the rotor without dismantling the pump. Bearing <br /> enclosures shall keep out contaminants and retain the lubricant and <br /> shall have adequate provisions for adding and draining lubricant. <br /> The frame shall provide ample clearance for stuffing box maintenance. <br /> 11A-6.06. Bearings. Bearings shall be either oil or grease lubricated <br /> antifriction type. Bearings shall have an AFBMA LU Life Rating of <br /> 40,000 hours at specified operating conditions. le pump shaft speed <br /> shall not exceed the bearing manufacturer's limitation. <br /> 11A-6.07. Flexible Coupling. The pump coupling shall have a horsepower <br /> rating 1.25 times the motor nameplate horsepower when the misalignment <br /> is within the manufacturer's tolerance limit. Coupling design shall <br /> permit removal of the pump rotating element without disconnecting the <br /> piping, moving the drive unit, or axial movement of the coupling halves <br /> on the shaft. <br /> 11A-6.08. Accessories. Each pump shall be provided with lifting <br /> eyebolts or lugs; plugged gauge cock connections at the suction and <br /> discharge nozzles; tapped and plugged openings for casing assembly and <br /> (MARLEY FSSF ) <br /> (CONTRACT NO. 13) 11A-4 <br /> (11654.812 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.