Laserfiche WebLink
MONITORING WELL INSTALLATION REPORT <br /> Date: CONSTRUCTION <br /> Premise Address: Total Depth <br /> Screen Length (from) (to) <br /> Well No.: Filter Pack (from) (to) <br /> Bentonite (from) (to) <br /> Inspector: Grout (from) <br /> (to) <br /> Drilling rig type <br /> Permit No. Auger O.D. I.D. <br /> Drilling Company: Completion - Stove pipe/christie box (circle one) <br /> Driller: casing <br /> Consultant height <br /> Geologist <br /> ABOVE-GROUND <br /> COMPLETION CWSTY-80X <br /> SPECIAL PERMIT INFO. Ground Surface COMPLETION <br /> Surface <br /> Distance to sewer line Grout <br /> Domestic well on site - (y/n) <br /> If yes, location and distance - n, <br /> n. n. <br /> — m <br /> — e <br /> = m <br /> SAMPLING = o <br /> slottad — c <br /> sa=on _ <br /> Holding Temperature = <br /> Method _ _ praval pads <br /> Screening Method ' — <br /> Tracking Sheet - ( Y/ n) ":s. <br /> SPOILS <br /> Storage Method MATERIALS/DEVELOPMENT <br /> Contamination Noted - (y/n ) <br /> Storage Location Casing type <br /> Blank ft. Screen ft. <br /> Slot size <br /> GROUTING Bags cement <br /> Buckets bentonite <br /> Depth twater Bags sand/gravel <br /> Mix Ratios Filter Pack type/size <br /> Installation Method Surge Block: - (y/n ) <br /> Quantity Installed Discussed with geologist: - (y/n) <br /> EH 29 29 Type of method <br />