Laserfiche WebLink
ey x�w '. •l.R=-r�'..�,J't ' Sf'si ".r U1 n 1.,.^' �.. .�} r. j1 ...pi <br /> S <br /> t <br /> ;;Ite Pssessment Report April 5, 1 <br /> Page <br /> 7 <br /> 139 South Center,Stockton,CA <br /> ea <br /> well from the bottom of the well bore up to Meet above the top of the well screen. A 2-foot-thick layer <br /> p set <br /> of hydrated bentonite pellets was Placed above each sand fitter pack and a cement surfer seal v.as <br /> to grade level above the bentonite. A traffic-rated Qd400 Wheaton box was placed over the cap. The <br /> wellheads were sealed with locking plugs. Well oonstructlon d9wis are presented on the drill logs In <br /> Appendix B. Well iecation photographs are Presented as Figure 3. <br /> 1 Before the cement seal for mtinitoring well MW-4 had set completely,a gasoline delivery truck <br /> l passed over it and over the red warning cone that had been Plate atop the traffic cover. <br /> i.: Consequently,Groundwater Technology staff personnel had to return to the site and rebuild the surface <br /> r:d <br /> prctr c,Ion for this well. <br /> Mlonitarina Well pevefoo et Standard Groundwater Techneiogy well development <br /> �.. <br /> procedures require new wells to be devetaped using a combination of bailing,surging and pumping. <br /> Groundwater Technology empiL yed a truck-mounted surge block and ballet system to develop ti-a four <br /> new wells on March 8, 1991. Development of the monitoring wells entailer!the ex'laction of between 60 <br /> and 70D-gallons of well water. The well was sampled when the well volume had recovered to at least 80 <br /> i percent of Its original static water level. <br /> i <br /> t.; <br /> .� <br /> nhoring well MW-4 found to be bent slightly,so that <br /> During development,the casing for m. <br /> �., the metal surge block could not pass down IL Therefore,a F s/C bailer was used to develop this well. <br /> l r <br /> GROUNDWATER MONITORING AND SAMPLING <br /> = On February 15, 1991,monitoring wells MW-1,MW-2 and MW-3 were professionally surveyed to ;. <br /> a common datum to rtetermirw wellhead elevations. The depth-to-groundwater was then measured <br /> using an Interface Probe,to make a preliminary determination of the groundwater gradient direction Prior <br /> -4 near the waste oil tank.On the basis of this preliminay det:rmina�tlon of <br /> to the Installation of MW the <br /> 3 groundwater gradient direction, monitoring wellMW-4 was sited t0 the north ole oil tank,In a <br /> j.� downg adient direction from the waste-oil tank. On March 8, 1941,the elevation of the wellhead of <br /> MW-4 and the horizontal Position of the four monitoring wells were professionally surveyed <br /> referenced to a common United States Geological Survey dawn. <br /> p •GROUN©WATER <br /> i'TECHNOLOGY,INC. <br /> 111�a ....reAAa�IaC! flag^. _ <br />