My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0541087
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 3:36:03 PM
Creation date
2/22/2019 3:33:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541087
PE
2959
FACILITY_ID
FA0023524
FACILITY_NAME
SPX MARLEY COOLING FACILITY
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daniel Ritter <br /> From: Steve Stuart <br /> Sent: Tuesday, June 14, 2016 5:06 PM <br /> To: Daniel Ritter <br /> Subject: FW: Revised Work Plan for Wells MW-402 and MW-451 <br /> STEVEN STUART, P.E. C79764 <br /> SENIOR HYDROGEOLOGIST <br /> DUDEK <br /> ENGINEERING+ENVIRONMENTAL <br /> 605 THIRD STREET <br /> ENCINITAS.CALIFORNIA 92024 <br /> T 760-479-4128 F 760-942-5206 C 760415-9079 <br /> W W W DUDEK.COM <br /> PLEASE NOTE:Dudek&Associates uses an email filter to clean viruses and filter Spam.Please take the time to verify receipt of any important or time-sensitive <br /> email sent to us. <br /> From: Herrmann, Martin@DTSC [mailto:Martin.Her rmannCaldtsc.ca.gov] <br /> Sent: Tuesday, June 14, 2016 4:18 PM <br /> To: Steve Stuart <br /> Cc: walter.galacki0spx.com; Bascomb, Dawn@DTSC; Brown, Jeff@DTSC; Shrum, Noel@DTSC <br /> Subject: RE: Revised Work Plan for Wells MW-402 and MW-451 <br /> Steve, <br /> DTSC has reviewed the Revised Work Plan for Wells MW-402 and MW-451 dated June 14,2016 which was <br /> revised based on our teleconference discussions yesterday. DTSC concurs with the planned relocation and <br /> redesign of the wells.There was however no statement or any reference to baseline sampling. <br /> DTSC grants contingent approval to install the wells with the understanding that SPX will complete baseline <br /> sampling between 72 hours after development is completed and before starting any mass removal extraction <br /> related pumping. <br /> A formal letter of approval for the workplan is to follow. <br /> Martin G. Herrmann, P.E. <br /> Hazardous Substance Engineer <br /> Brownfields and Environmental Restoration Program <br /> Department of Toxic Substances Control <br /> 8800 Cal Center Drive <br /> Sacramento,CA 95826 <br /> (916)255-3592 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.