Laserfiche WebLink
TABLE 6 <br /> HISTORIC GROUNDWATER ANALYTICAL RESULTS AND PROPOSED COMPLIANCE WELL BACKGROUND CONCENTRATION LIMITS <br /> FULL SCALE IN SITU HEXAVALENT CHROMIUM REDUCTION TREATMENT <br /> FORMER MARLEY COOLING TOWER SITE <br /> STOCKTON, CALIFORNIA <br /> Laboratory Analyses <br /> Hexavalent <br /> Nitrate as N Chromium Chromium Manganese <br /> Well Sample Date Event/Purpose m L * Sulfate (mg/L Calcium (mg/L Arsenic(pg/L) (gg/L L Iron L /L TDS m L <br /> Water Quality Objective 10 250 -- 10 50 50** 300 50 450 <br /> Background/Compliance Wells <br /> MW-401 7/1/2000 Hist. Sum.GW Quality -- -- -- 3 -- -- -- -- <br /> 1/1/2001 Hist. Sum.GW Quality -- -- -- 3 -- -- -- -- <br /> 4/1/2007 Dudek 2007 Annual Rpt -- -- -- -- 4 -- -- --1/9/2008 Background 3.7 16.9 NA <5 <10 <10 93 <10 284 <br /> Historic Concentration Range 16.9 <5 3 -<10 93 <10 <br /> WDR/MRP Suggested Upper Limit Background Concentration 22 6.5 13 121 6 <br /> Proposed Upper Limit Background Concentration 22 10 <br /> 4/1/2008 Dudek 2008 Semiannual Rpt -- -- -- -- 5 -- -- -- -- <br /> 7/10/2008 3rd Qtr./Compliance 2.3 16.2 NA <5 <10 <10 157 <10 252 <br /> 10/22/2008 4th Qtr./Compliance 2.4 14.3J NA 5.0 <10 <10 <100 <10 229J <br /> 1/8/2009 1st Qtr./Compliance 1.8 20.3 NA 6.0 11 <10 <100 <10 236 <br /> 4/7/2009 2nd Qtr./Compliance 2.7 17.4 NA 5.0 <10 <10 130 <10 253 <br /> 7/14/2009 3rd Qtr./Compliance NA 16.2 <5 <10 <10 115 <10 230 <br /> 10/12/2009 4th Qtr. NA 15.9 5.0 5 <10 119 <10 247 <br /> 2/1/2010 1st Qtr. NA 17.7 4.0 6 <10 152 <10 266 <br /> 4/13/2010 2nd Qtr. NA 16.2 5.0 7 <lOUJ <100 <10 283 <br /> 7/7/2010 3rd Qtr. NA 14.1 5.0 4 <10 124 <10 235 <br /> 10/12/2010 4th Qtr. NA 14.2 4.OJ 5J <10 69 <10 219 <br /> 1/20/2011 1st Qtr. NA 14.OJ NA 6.0 <10 0.98 39 <10 257 <br /> 4/13/2011 2nd Qtr. NA 13.4 NA 5.0 3J 0.74 120 <10 218 <br /> 7/19/2011 3rd Qtr. NA 14.0 NA 5.0 <10 <10 57 <10 225 <br /> 10/12/2011 4th Qtr. NA 19.4 NA 4J <10 <0.5 99 20 237 <br /> Overall Concentration Range <1.0-69.6 5.6-74 2- 19 1 -480 <0.5 -20 39 - 1,340 6J-70 162- 1430 <br /> Notes: <br /> BOLD values exceed Water Quality Objective(WQO). <br /> Blue highlight values represent proposed upper limit background concentrations. <br /> Yellow highlight values exceed the proposed upper limit background concentration,but not WQO. <br /> BOLD BOLD and yellow highlight values exceed of the WQOs and proposed upper limit background concentrations. <br /> Background sampling represents the first MWH collected samples associated with the Site-wide in situ remedial program to monitor outside the primary chromium plume boundary, <br /> and areas of anticipated significant treatment. <br /> Quarterly/Compliance sampling was established for the program to track treatment performance by quarter(typically sampled in January,April,July,October). <br /> * Nitrate concentrations were reported as NO3 and converted to N by multiplying NO3 concentrations by 0.226(ratio of molecular weight of nitrogen[14]to nitrate[62]). <br /> **The Water Quality Objective for the Hexavalent Chromium will use the same guidelines as the Chromium column for reference purposes only. <br /> NA-Not Analyzed. <br /> -- Data not available. <br /> J-Result is estimated <br /> mg/L-milligrams per liter <br /> MRP-Monitoring and Reporting Program <br /> TDS-total dissolved solids <br /> µg/l,-micrograms per liter <br /> WDR-Waste Discharge Requirements <br /> MW-211(Supplemental)-Wells MW-211,MW-310,and MW-325 have been sampled to supplement the background wells for the program,but are not required per the WDR/MRP. <br /> (Page 9 of 9) <br />