Laserfiche WebLink
2012 Semiannual Groundwater Monitoring and Evaluation Report <br /> Full-Scale In Situ Hexavalent Chromium Reduction Treatment Implementation <br /> Former Marley Cooling Tower Site, Stockton,California October 2012 <br /> 3.1.3 Northern Injection Area Wells <br /> Baseline well sampling results represent conditions within and around the current established Cr <br /> plume boundary and areas of treatment. Quarterly well sampling results track the performance <br /> of the treatment by quarter. <br /> Consistent with the WDR, the first two 2012 quarterly monitoring and sampling events included <br /> MW-1, MW-2, MW-8, MW-101, MW-102, MW-104 (S-2), MW-105, MW-106, MW-207, <br /> MW-208, MW-213 (I-7), MW-300, MW-323, MW-361, TW-12, and TW-13 in the northern area <br /> of the Site to obtain information on groundwater quality. Wells MW-6, MW206, MW214 (I-8) <br /> and MW-320 continued with quarterly sampling and well EW-3 was sampled during the first <br /> quarterly event, though they are not required by the MRP. EW-3 was sampled during the second <br /> quarterly event for dissolved chromium and field parameters as part of the overall groundwater <br /> monitoring program, which will be reported on by Dudek. <br /> 3.1.4 Southern Injection Area Wells <br /> Consistent with the WDR, the first two 2012 quarterly monitoring and sampling events included <br /> MW-9, MW-204 (S-8), MW-205 (S-7), MW-301, MW-303, MW-321 (1-9), MW-322, MW-324 <br /> (I-10), TW-14, TW-15, TW-16, TW-17, MW-4475, MW-447D, MW-4485, and MW-448D to <br /> obtain information on groundwater quality. Wells EW-1 and I-11 continued with quarterly <br /> sampling, though they are not required by the MRP. Due to the presence of steel 1-beams, which <br /> could not be moved before or during the noted sampling period, despite repeated requests to <br /> move the steel, wells TW-14 and TW-15 could not be sampled during the first quarterly event <br /> and wells TW-14 and MW-204 could not be sampled during the second quarterly event. These <br /> wells were sampled as part of the third quarter 2012 sampling event, which will be reported in <br /> the 2012 Annual Report and is due by February 2013. <br /> 3.2 GROUNDWATER ELEVATION, ESTIMATED GRADIENT, AND <br /> LINEAR VELOCITY <br /> Potentiometric surface maps were prepared by Dudek for the Shallow, 100-Foot Sand, and <br /> Intermediate zones using groundwater data collected in January and April 2012. Depth-to- <br /> groundwater and groundwater-elevation measurements are presented in Table 4. Potentiometric <br /> (D IVBWH, <br /> 3-3 <br />