Laserfiche WebLink
2012 Semiannual Groundwater Monitoring and Evaluation Report <br /> Full-Scale In Situ Hexavalent Chromium Reduction Treatment Implementation <br /> Former Marley Cooling Tower Site, Stockton,California October 2012 <br /> downgradient of the former retort pit (source area). A summary of the concentration trends for <br /> wells where Cr concentrations exceeded the WQO during the first and second quarters of 2012 is <br /> presented below. <br /> Wells where Cr concentrations have decreased to below the WOO. Quarterly sampling in <br /> the first half of 2012 showed that concentrations of total dissolved Cr or Cr+6 in well MW-321 (I- <br /> 9), which were above the WQO through January 2012, have now decreased to below the WQO <br /> (see Graph 32). <br /> Wells where Cr concentrations are above the WOO. Quarterly sampling in the first half of <br /> 2012 showed that concentrations of total dissolved Cr and Cr+6 is above the WQO in wells MW- <br /> 8, MW-102, MW-106, MW-204 (S-8), MW-205 (S-7), MW-207, MW-213, MW-301, MW- <br /> 447S, MW-447D, MW-448S, MW-448D, EW-3, and I-11 (see Graphs 6, 9, 12, 15, 16, 18, 23, <br /> 26, 39, 40, 41, 42, 44, and 47). <br /> Cr and Cr6+ concentration changes during the reporting period are summarized below. In some <br /> cases third quarter 2012 data is presented, on a preliminary basis, to provide additional <br /> understanding of the concentration trend at a particular well. All third quarter 2012 data will be <br /> documented in the 2012 Annual Report, which is due by February 2013. <br /> Wells MW-204 (S-8), MW-205 (S-7), MW-447S, MW-447D, MW-448S, and MW-448D are <br /> located in the South Yard and are in the area were reductant injections were implemented during <br /> third quarter 2012 in accordance with the Final Work Plan for Focused Supplemental <br /> Hexavalent Chromium Reduction as Part of the In Situ Remedial Action Plan Amendment <br /> Activities (MWH, 2012), and will be documented in the 2012 Annual Report, which is due by <br /> February 2013. Cr and Cr6+ concentrations decreased during the reporting period at wells MW- <br /> 204 and MW-448D. Cr and Cr6+ concentrations remained stable during the reporting period at <br /> wells MW-205, MW-447S, MW-447D, and MW-4485. <br /> MW-8: Concentrations of Cr and Cr6+ increased during the reporting period. It can be seen in <br /> Graph 6 that concentrations at this well do fluctuate; additionally, third quarter 2012 sampling <br /> results for MW-8 indicate that Cr and Cr6+ concentrations decreased to 400 and 388 gg/L, <br /> respectively, as compared to the second quarter 2012 results. <br /> (a MWH, <br /> 4-3 <br />